Nano World:> Products Show > Details  
     
 
Code JD-W
Name Exterior wall and roof cooling coating
Characteristic safe, non-toxic, easy application,, long lifetime, low cost
 products details

       

Exterior wall and roof cooling coating

Code: JD-W

 

Instruction

JD-W is one kind of heat insulation coating for outer wall, basicly suitable for southern housing.

It is mainly reflect 92% sunshine, and solar energy. With high performance for heat reflection, 

radiation and heat insulation .It is safe, non-toxic and haloduric, a brand new kind coating.

 

Characteristic

1. Wavelength: 400-1000nm,reflection ratio:95

2. Thermal radiation properties: in wavelength of 8-13.5μm,reflect to the outer surface

3. Ageing resistance:  5-8 years 

4. Based on water, non-toxic, no pollution

5. Application condition: -50--120

 

Parameter

Code

Exterior wall and roof cooling coating

Appearance

Honed

Solar reflectance

83%

Radiance

90%

Conductivity

ASTM 0.017w/m.K

Surface dry time

≤2h

Recoat time

20, 4H

Washability

2000T

Tensile strength

2.1MPa

WVT

8.0×10-8g(m s pa)

Alkali resistance

Good

Water tolerance

Good 

Solvent

Water-based

Coverage

2.53 m2/L

 

Application Filed

Roof, walls, ceiling . Storage tanks. Heat pipes. Cold storage.

 

Instruction

Substrate processing requirements:

New concrete surfaces must be reasonable of cement mortar curing time and let the "soda", and fully dried, 

its moisture content is less than 10%,PH less than 10 before the construction. Underlying surface should be dry. 

solid. strong, there should be no sanding. cracks. defects such as loose. Underlying surface must be clean, no

 dirt. Frost. pollutants such as oil and release agents. If there is such, shovel. wire brushed. sandpaper. 

Detergent to remove, rinse with water, drying until coating. Construction of wall surface after treatment should 

be carried out as soon as possible, so as to avoid new pollution.

 

Environmental requirements:

Painting should be carried out as soon as possible after processing of substrate. Substrate surface temperature 

and the ambient temperature is not lower than 10 ° c, the surface temperature should be at least higher than 

the dew point 3 ° c above. Relative humidity of air no more than 85% when ambient temperature of 5~10℃ is,

 depending on the coating surface speed, if the table in 30 minutes, you can work. 5 under construction should be stopped.

 

Construction

The paint brush can be used. roller coating and spraying method of construction.

Every road construction under construction continued after full drying.

Spray gun operation. Spraying should be controlled pressure for 0.6-0.8MPa. If the pressure is too low, the material is too slow; high pressure and rebound. Bucket spray perpendicular to the 

wall distance should be about 50cm, gun running, must be perpendicular to the painting surface, and coated surface and 

parallel to the plane moved in. When spraying, paint in the Middle keys, and next to the sparse, so each Xingyue one-third repeat run. Spray gun speed should be kept uniform, such as running too fast, coated relatively thin, uneven color. 

problems with poor coverage; such as running too slow, partial coating thickness or sagging.

 

Package

20kg/Barrel

 

 
     
© 2013-2015 By Shanghai huzheng nanotechnology Co.,Ltd. All Rights Reserved. 
Address:No 158,Xinjunhuan Rd., Minhang, Shanghai, China, Code:201114
Tel:+86-21-50428367 Fax:+86-21-50428369 Email:ry@hznano.com